Solset AISolset AI
Solset AISolset AI
DemosMarketplace
Pricing

Built for Maharashtra's Solar Industry

Best Solar Project Management Software in Maharashtra

Maharashtra's solar EPCs coordinate net-metering approvals across MSEDCL, BEST, Adani Electricity and Tata Power depending on the project location.

Free plan available No credit card needed

Why Maharashtra Solar Companies Need an Operating System

Generic tools like Salesforce or spreadsheets aren't built for the complexities of solar project management. Here is what Solset AI brings to your operations:

  • Solar-Specific Project Stages

    Pre-configured workflows: Site Survey → BOM Generation → Technical Proposal → Permit Submission → Installation → Interconnection → Handover.

  • WhatsApp-First Customer Updates

    Send automated milestone approvals, project updates, and payment reminders directly to your clients via WhatsApp.

  • BOM & Material Management

    Automatically calculate Bills of Materials (BOM) based on system size. Track panels, inverters, and racking structures to eliminate last-mile shortages.

  • MSEDCL & Net-Metering Tracking

    Custom milestones for MSEDCL, BEST, Adani Electricity, Tata Power inspection steps, document compliance, and subsidy status.

  • Warranty & Maintenance Scheduling

    Maintain complete client records. Schedule preventative maintenance, track service requests, and auto-remind clients prior to warranty expirations.

  • Real-Time Project Profitability

    Calculate the accurate P&L per project: track material purchases against POs, labor installation costs, and actual margin against budget.

Serving Solar Installers Across Maharashtra

Net-Metering Rules in Maharashtra

The sanctioned-load caps, approval windows and paperwork differ by distribution company. These are the figures Solset AI tracks against for all 3 utilities operating in Maharashtra.

Max system size
100%
of sanctioned load
Approval window
14–21 working days
stated by the utility
PM Surya Ghar
3 of 3
integrated for DBT subsidy
Distribution companyMax % of loadLT limitApprovalMetering
MSEDCL (Mahavitaran)MSEDCL Renewable Energy Portal 100%150 kW21 daysNet + Gross
Tata Power MumbaiTata Power Customer Portal 100%100 kW15 daysNet
Adani Electricity MumbaiAdani Electricity Rooftop Portal 100%100 kW14 daysNet

Policy notes by utility

MSEDCL (Mahavitaran)
  • ·Up to 100% of sanctioned load permitted for net metering.
  • ·Annual energy settlement cycle ends in March with banking credits.
  • ·Fully integrated with the PM Surya Ghar National Portal for DBT subsidies.
Tata Power Mumbai
  • ·Fast digital processing within 15 working days.
  • ·Net metering available for all residential and institutional categories.
Adani Electricity Mumbai
  • ·Rapid digital net-meter installation.
  • ·Zero application fees for residential rooftop systems under PM Surya Ghar.

Documents to collect from the customer

MSEDCL (Mahavitaran)
  • ·Latest MSEDCL electricity bill with paid receipt
  • ·Property ownership deed / Index-II / Tax receipt
  • ·Aadhaar card of consumer & passport size photograph
  • ·DCR module certificate & inverter manufacturer test report
Tata Power Mumbai
  • ·Electricity bill
  • ·Identity proof
  • ·Site single-line diagram (SLD)
Adani Electricity Mumbai
  • ·Latest bill
  • ·NOC from building society (for apartments)
  • ·Inverter test cert

Residential projects in Maharashtra may also claim Central Financial Assistance under PM Surya Ghar — up to ₹78,000 for systems of 3 kW and above. Estimate a customer's subsidy →

Solset AI also supports projects under BEST in Maharashtra. Published net-metering figures for that utility are not listed above — check the DISCOM directory for the current process.

Frequently Asked Questions — Solar CRM Maharashtra

What is the maximum rooftop solar system size allowed in Maharashtra?

Utilities in Maharashtra permit up to 100% of your sanctioned load under net metering. Solset AI checks each project's proposed capacity against the sanctioned load on the customer's bill before the application goes out.

How long does net-metering approval take in Maharashtra?

Stated approval windows in Maharashtra run from 14 to 21 working days depending on the utility. Solset AI stamps the date each application enters a stage, so you can see which files are past the published window instead of guessing.

Which Maharashtra utilities are integrated with the PM Surya Ghar portal?

3 of the 3 Maharashtra utilities we track are integrated with the National Portal for DBT subsidy disbursal. Residential systems can claim Central Financial Assistance of up to ₹78,000 at 3 kW and above.

Does Solset AI support net-metering tracking for Maharashtra?

Yes. You can add custom project milestones for MSEDCL, BEST, Adani Electricity, Tata Power application submission, inspection scheduling, and net-metering approval, with automated reminders so nothing falls through the cracks.

Which cities in Maharashtra use Solset AI?

Solar EPCs and installers across Mumbai, Pune, Nagpur, Nashik and other cities in Maharashtra use Solset AI as their primary project management software.

How much does Solset AI cost for solar companies in Maharashtra?

Solset AI offers a free plan for small teams. Paid plans start at affordable Indian Rupee pricing — see our pricing page. No credit card is required to get started.

Does Solset AI work on mobile for field engineers?

Yes, on Android: the Solset AI app is live on Google Play, on the same account and data as the web app. The iPhone app is not published yet; on an iPhone the web app works in the browser, where field engineers update site surveys and task status, upload site photographs and log installation progress.

Free to start

Start Managing Your Maharashtra Solar Projects Better — Free

Deploy Solset AI as the operating system for your solar company. Free plan, no credit card.